Badaling 1 MW tower plant is a pilot plant undertaken and owned by CAS. It was the first megawatt scale CSP in Asia.
Project Overview | |
Power Station: | Badaling Dahan 1 MW Tower |
Location: | Badaling, Yanqing, Beijing, China |
Owners (%): | Institute of Electrical Engineering of CAS |
Technology | Power Tower |
Solar Resource: | 1290 |
Nominal Capacity: | 1 MW |
Status | Operational |
Start Year: | 2012 |
Status Date | 44533 |
Background | |
Break Ground Date | 2009 |
Expected Generation (GWh/year) | 1.9 |
Lat/Long Location | 40.382,115.938 |
Total Power Station Land Area (km²) | 0.05 |
Participants | |
Developer | Institute of Electrical Engineering of CAS, China |
EPC | Institute of Electrical Engineering of CAS, China |
Operator | Institute of Electrical Engineering of Chinese Academy of Sciences |
Costs | |
Policy Support Scheme | “11th Five-Year plan” (863 program) |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 10000 |
# of Heliostats (or dishes for dish systems) | 100 |
Heliostat Aperture Area (m²) (or dish aperature for dish systems) | 100 |
Collector/Heliostat Manufacturer | Himin Solar, China |
Collector/Heliostat Engineering or IP Owner | Himin Solar, China |
Mirror Manufacturer | Taishan Huayue, China |
Solar Field (Receiver) | |
Receiver Working Fluid | Water |
Receiver Working Fluid Category | Water |
Tower Height (m) | 118 |
Receiver Manufacturer | Dongfang, China |
Receiver Model | Cavity Receiver (5×5 m) |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1 MW |
Turbine Manufacturer | Hangzhou Steam Turbine Company, China |
Power Cycle | Steam Rankine |
Cooling Type | Wet (Closed water) |
Thermal Energy Storage | |
Storage Type | Other |
Storage Capacity (Hours) | 1 |
Storage Description | Two stages: saturated steam/oil |