Project Overview | |
Power Station: | CEEC Hami – 50MW Tower |
Location: | Yiwu, Hami, Xinjiang (XUAR), China |
Owners (%): | China Energy Engineering Corporation (CEEC) |
Technology | Power Tower |
Solar Resource: | 1789 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2019 |
Status Date | 21-Oct-22 |
Background | |
Break Ground Date | 2017 |
Expected Generation (GWh/year) | 198.4 |
Lat/Long Location | 43.613785, 94.956374 |
Total Power Station Land Area (km2) | 4.4 |
Participants | |
Developer | China Energy Engineering Corporation (CEEC), Dongfang Electric, China |
EPC | Northwest Power Design Institute (NWEPDI) of CEEC, China |
Electricity Generation Offtaker | The State Grid Xinjiang Electric Power |
Construction Job Years | 1200 |
Annual Operations Jobs | 50 |
Costs | |
Total Construction Cost (2017) | 1580.00 million |
Total Cost USD (2020) | $238.12 million |
Specific Cost/kW USD (2020) | $4,762.30 |
LCOE USD/kWh (2020) | $0.10 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration RMB/kWh | 1.15 |
Remuneration Start Year | 2017 |
Remuneration USD/kWh Deflated (2020) | 0.17 |
PPA or Tariff Period (Years) | 20 |
Support Scheme Type | FIT |
Policy Support Scheme | Chinese Demonstration Program 1st Batch |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 696751 |
Quantity of Heliostats (or dishes for dish systems) | 14500 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 50 |
Collector/Heliostat Manufacturer | Wuham, China |
Collector/Heliostat Engineering or IP Owner | Stellio Consortium(SBP), Germany |
Collector/Heliostat Model | Stellio |
Mirror Manufacturer | Wuhan Sunnpo Solar Technology Co.,Ltd., China |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt – Potassium nitrate |
Receiver Working Fluid Category | Salt |
Working Fluid Manufacturer | Jiaocheng Bingsheng Chemical |
Tower Height (m) | 220 |
Solar Field or Receiver Inlet Temperture (℃) | 290℃ |
Solar Field or Receiver Outlet Temperture (℃) | 560℃ |
Receiver Manufacturer | Dongfang, China |
Receiver Model | External – cylindrical |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Turbine Manufacturer | Dongfang Boiler, China |
Turbine Model | N50-14/550/550 |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 140 |
Turbine Efficiency Percent | 44 |
Steam Generator System Manufacturer | Dongfang, China |
Cooling Type | Dry (direct air) |
Thermal Energy Storage | |
Storage Type | 2-tank direct |
Storage Capacity (Hours) | 13 |
Storage Description | Molten Salt |
TES Engineering Company | Bluestar (Beijing) Chemical Machinery Co., Ltd., China |