Project Overview | |
Power Station: | City of Medicine Hat ISCC Project |
Location: | Medicine Hat, Canada |
Owners (%): | City of Medicine Hat |
Technology | ISCC, Trough |
Nominal Capacity: | 1.1 MW |
Status | Operational |
Start Year: | 2014 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2013 |
Expected Generation (GWh/year) | 1.5 |
Lat/Long Location | 50.04,-110.72 |
Participants | |
Developer | City of Medicine Hat |
Costs | |
Total Construction Cost (2014) | $ 9.00 million |
Total Cost USD (2020) | $9.93 million |
Specific Cost/kW USD (2020) | 9024.3 |
LCOE USD/kWh (2020) | 0.57 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 5248 |
# of Solar Collector Assemblies (SCAs) | 8 |
# of Loops | 2 |
# of SCAs per Loop | 4 |
SCA Aperture Area (m2) | 656 |
SCA Length (m) | 115 |
Collector/Heliostat Engineering or IP Owner | SkyFuel, USA |
Collector/Heliostat Model | SkyTrough |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide: Xceltherm |
Receiver Working Fluid Category | Thermal oil/organics |
Working Fluid Manufacturer | Radco Industries |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1.1 MW |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP