Project Overview | |
Power Station: | Jülich Solar Tower |
Location: | Jülich, North Rhine-Westphalia, Germany |
Owners (%): | DLR |
Technology | Power Tower |
Solar Resource: | 902 |
Nominal Capacity: | 1.5 MW |
Status | Operational |
Start Year: | 2008 |
Status Date | December 03, 2021 |
Background | |
Break Ground Date | 2007 |
Lat/Long Location | 50.915,6.388 |
Total Power Station Land Area (km2) | 0.17 |
Participants | |
Developer | Kraftanlagen München, German Aerospace Center, Solar-Institute Jülich, Germany |
EPC | Kraftanlagen München, Germany |
Operator | DLR |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 17650 |
# of Heliostats (or dishes for dish systems) | 2153 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 8 |
Solar Field (Receiver) | |
Receiver Working Fluid | Air |
Receiver Working Fluid Category | Air |
Tower Height (m) | 60 |
Receiver Manufacturer | Kraftanlagen München |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1.5 MW |
Turbine Manufacturer | Siemens, Germany |
Cooling Type | Dry |
Thermal Energy Storage | |
Storage Type | Other |
Storage Capacity (Hours) | 1.5 |
Storage Description | Ceramic heat sink |