Project Overview | |
Power Station: | Agua Prieta II |
Location: | Agua Prieta, Sonora, Mexico |
Owners (%): | Federal Electricity Commission |
Technology | ISCC, Trough |
Nominal Capacity: | 12 MW |
Status | Operational |
Start Year: | 2017 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2011 |
Expected Generation (GWh/year) | 34 |
Lat/Long Location | 31.326,-109.549 |
Total Power Station Land Area (km2) | 0.6 |
Participants | |
Developer | Abengoa Solar, Spain |
EPC | Abener, Spain |
Costs | |
Concessional Funding or Other Support | Global environmental facility subvention |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 85000 |
# of Solar Collector Assemblies (SCAs) | 104 |
# of Loops | 26 |
# of SCAs per Loop | 4 |
SCA Length (m) | 150 |
Collector/Heliostat Engineering or IP Owner | Abgeoa |
Collector/Heliostat Model | ASTRO |
Mirror Manufacturer | Rioglass, Spain |
Solar Field (Receiver) | |
Receiver Working Fluid | Thermal Oil |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 12 MW |
Power Cycle | Steam Rankine |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...