Project Overview | |
Power Station: | Borges Termosolar |
Location: | Les Borges Blanques, Lleida, Catalonia, Spain |
Owners (%): | Abantia, Comsa |
Technology | Biomass-Hybrid, Trough |
Solar Resource: | 1878 |
Nominal Capacity: | 22.5 MW |
Status | Operational |
Start Year: | 2012 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2011 |
Expected Generation (GWh/year) | 44.1 |
Lat/Long Location | 41.529,0.8 |
Total Power Station Land Area (km²) | 0.96 |
Participants | |
Developer | Abantia, Spain |
EPC | Abantia & Comsa, Spain |
Annual Operations Jobs | 30 |
Costs | |
Total Construction Cost (2012) | € 153.00 million |
Total Cost USD (2020) | $215.99 million |
Specific Cost/kW USD (2020) | 9599.4 |
LCOE USD/kWh (2020) | 0.42 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration EUR/kWh | 0.27 |
Remuneration Start Year | 2012 |
Remuneration USD/kWh Deflated (2020) | 0.38 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | FIT |
Policy Support Scheme | Real Decreto 661/2007 |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 183120 |
# of Solar Collector Assemblies (SCAs) | 336 |
# of Loops | 56 |
# of SCAs per Loop | 6 |
# of Modules per SCA | 8 |
SCA Aperture Area (m²) | 545 |
SCA Length (m) | 96 |
Collector/Heliostat Manufacturer | Siemens |
Collector/Heliostat Engineering or IP Owner | Solel, Israel |
Collector/Heliostat Model | SunField 6 |
Solar Field (Receiver) | |
Receiver Working Fluid | Thermal Oil |
Receiver Working Fluid Category | Thermal oil/organics |
# of Heat Collector Elements (HCEs) | 8064 |
Solar Field or Receiver Inlet Temperture (C) | 293°C |
Solar Field or Receiver Outlet Temperture (C) | 393°C |
Receiver Manufacturer | Siemens |
Receiver Model | UVAC-2010 |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 22.5 MW |
Turbine Manufacturer | MAN Turbo, Germany |
Power Cycle | Steam Rankine |
Turbine Efficiency Percent | 37 |
Cooling Type | Wet |