Project Overview | |
Power Station: | Ibersol Ciudad Real (Puertollano) |
Location: | Puertollano |
Ciudad Real | |
Castilla-La Mancha Spain | |
Owners (%): | 90% Iberdola; IDAE 10% |
Technology | Parabolic Trough |
Solar Resource: | 2042 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2009 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2007 |
Expected Generation (GWh/year) | 103 |
Lat/Long Location | 38.643,-3.975 |
Total Power Station Land Area (km²) | 1.5 |
Participants | |
Developer | Iberdrola |
Spain | |
EPC | Iberdrola Renovables |
Spain | |
Operator | Iberdrola Renovables |
Electricity Generation Offtaker | Market |
Annual Operations Jobs | 60 |
Costs | |
Total Construction Cost (2009) | € 200.00 million |
Total Cost USD (2020) | $322.19 million |
Specific Cost/kW USD (2020) | 6443.8 |
LCOE USD/kWh (2020) | 0.27 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration EUR/kWh | 0.27 |
Remuneration Start Year | 2009 |
Remuneration USD/kWh Deflated (2020) | 0.43 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | FIT |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 287760 |
# of Solar Collector Assemblies (SCAs) | 352 |
# of Loops | 88 |
# of SCAs per Loop | 4 |
# of Modules per SCA | 12 |
Collector/Heliostat Manufacturer | Iberdrola |
Spain | |
Collector/Heliostat Engineering or IP Owner | Iberdrola |
Spain | |
Collector/Heliostat Model | ET-150 |
Mirror Manufacturer | Flabeg, Rioglass |
Germany, Spain | |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide: Dowtherm A |
Receiver Working Fluid Category | Thermal oil/organics |
Working Fluid Manufacturer | Dow |
# of Heat Collector Elements (HCEs) | 6336 |
Solar Field or Receiver Inlet Temperture (C) | 304°C |
Solar Field or Receiver Outlet Temperture (C) | 391°C |
Receiver Manufacturer | Schott, Solel |
Germany; Israel | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Turbine Manufacturer | Siemens |
Germany | |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 100 |
Turbine Efficiency Percent | 38.9 |
Cooling Type | Wet |