Project Overview | |
Power Station: | Godawari Solar Project |
Location: | Nokh |
Rajhastan India | |
Owners (%): | Godawari Green Energy |
Technology | Parabolic Trough |
Solar Resource: | 1667 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2013 |
Status Date | October 21, 2022 |
Background | |
Break Ground Date | 2011 |
Expected Generation (GWh/year) | 118 |
Lat/Long Location | 27.601,72.224 |
Total Power Station Land Area (km2) | 1.5 |
Participants | |
Developer | Godawari Green Energy |
India | |
EPC | Lauren Engineering |
USA | |
Electricity Generation Offtaker | NTPC Vidyut Vyapar Nigam Limited |
Costs | |
Total Construction Cost (2013) | 7900.00 million |
Total Cost USD (2020) | $145.71 million |
Specific Cost/kW USD (2020) | 2914.1 |
LCOE USD/kWh (2020) | 0.11 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration INR/kWh | 12.2 |
Remuneration Start Year | 2013 |
Remuneration USD/kWh Deflated (2020) | 0.23 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | PPA |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 392400 |
# of Solar Collector Assemblies (SCAs) | 480 |
# of Loops | 120 |
# of SCAs per Loop | 4 |
# of Modules per SCA | 12 |
SCA Aperture Area (m虏) | 817 |
SCA Length (m) | 144 |
Collector/Heliostat Engineering or IP Owner | SBP, Flagsol |
Germany | |
Collector/Heliostat Model | SKAL ET-150 |
Mirror Manufacturer | Flabeg |
Germany | |
Mirror Model | RP3 |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide: Dowtherm A |
Receiver Working Fluid Category | Thermal oil/organics |
Working Fluid Manufacturer | Dow |
Solar Field or Receiver Inlet Temperture (C) | 293°C |
Solar Field or Receiver Outlet Temperture (C) | 390°C |
Receiver Manufacturer | Schott |
Germany | |
Receiver Model | PTR 70 |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Turbine Manufacturer | Siemens |
Germany | |
Turbine Model | SST-700 |
Cooling Type | Wet |