Project Overview | |
Power Station: | Saguaro Power Plant |
Location: | Red Rock |
Arizona United States | |
Owners (%): | Arizona Public Service |
Technology | Parabolic Trough |
Nominal Capacity: | 1 MW |
Status | Currently Non-Operational |
Start Year: | 2006 |
Status Date | December 05, 2021 |
Background | |
Break Ground Date | 2004 |
Expected Generation (GWh/year) | 2 |
Lat/Long Location | 32.548,-111.293 |
Total Power Station Land Area (km虏) | 0.06 |
Participants | |
Developer | Arizona Public Service |
USA | |
EPC | Solargenix |
USA | |
Operator | Arizona Public Service |
Electricity Generation Offtaker | Arizona Public Service |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m虏) | 10340 |
# of Solar Collector Assemblies (SCAs) | 24 |
# of Loops | 3 |
# of SCAs per Loop | 8 |
# of Modules per SCA | 12 |
SCA Length (m) | 97 |
Collector/Heliostat Manufacturer | Starnet |
USA | |
Collector/Heliostat Model | LS-2 |
Mirror Manufacturer | Flabeg |
Germany | |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide: Xceltherm |
Receiver Working Fluid Category | Thermal oil/organics |
Working Fluid Manufacturer | Radco Industries |
# of Heat Collector Elements (HCEs) | 528 |
Solar Field or Receiver Inlet Temperture (C) | 120°C |
Solar Field or Receiver Outlet Temperture (C) | 300°C |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1 MW |
Turbine Manufacturer | Ormat |
Israel | |
Power Cycle | Organic Rankine |
Power Cycle Pressure (Bar) | 22.2 |
Turbine Efficiency Percent | 20.7 |
Cooling Type | Wet |