Project Overview | |
Power Station: | KaXu Solar One |
Location: | Pofadder |
Namakwa District Municipality | |
Northern Cape South Africa | |
Owners (%): | Abengoa |
Technology | Parabolic Trough |
Solar Resource: | 2963 |
Nominal Capacity: | 100 MW |
Status | Operational |
Start Year: | 2015 |
Background | |
Break Ground Date | 2012 |
Expected Generation (GWh/year) | 330 |
Lat/Long Location | -28.902,19.621 |
Participants | |
Developer | Abengoa |
Spain | |
EPC | Abener, Teyma |
Spain | |
Electricity Generation Offtaker | Eskom |
Costs | |
Total Construction Cost (2015) | $860.00 million |
Total Cost USD (2020) | $903.08 million |
Specific Cost/kW USD (2020) | 9030.8 |
LCOE USD/kWh (2020) | 0.24 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration ZAR/kWh | 2.69 |
Remuneration Start Year | 2015 |
Remuneration USD/kWh Deflated (2020) | 0.22 |
Support Scheme Type | PPA |
Concessional Funding or Other Support | Development Bank of South Africa $146 million, €220 million EIB; IFC $125 million, mobilization of senior loan from CTF $26.5 million, |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 800000 |
# of Solar Collector Assemblies (SCAs) | 1200 |
# of Loops | 300 |
# of SCAs per Loop | 4 |
# of Modules per SCA | 10 |
Collector/Heliostat Manufacturer | Abengoa |
Spain | |
Collector/Heliostat Engineering or IP Owner | Abengoa |
Spain | |
Collector/Heliostat Model | E2 |
Mirror Manufacturer | Rioglass |
Spain | |
Solar Field (Receiver) | |
Receiver Working Fluid | Thermal Oil |
Receiver Working Fluid Category | Thermal oil/organics |
Receiver Manufacturer | Schott |
Germany | |
Receiver Model | PTR 70 |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Turbine Manufacturer | Siemens |
Germany | |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 100 |
Cooling Type | Dry |
Thermal Energy Storage | |
Storage Type | 2-tank indirect |
Storage Capacity (Hours) | 2.5 |
Storage Description | Molten salts |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...