Project Overview | |
Power Station: | Redstone |
Location: | Potmasburg |
Northern Cape South Africa | |
Technology | Power Tower |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2023 |
Background | |
Break Ground Date | 2021 |
Expected Generation (GWh/year) | 466 |
Lat/Long Location | -28.298476,23.368182 |
Participants | |
Developer | ACWA, SolarReserve |
Saudi Arabia, United States | |
EPC | SEPCO III |
China | |
Electricity Generation Offtaker | Eskom |
Construction Job Years | 2000 |
Annual Operations Jobs | 100 |
Costs | |
Total Construction Cost (2020) | 116000.00 million |
Total Cost USD (2020) | $704.22 million |
Specific Cost/kW USD (2020) | 7042 |
LCOE USD/kWh (2020) | 13 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Policy Support Scheme | REIPPPP BW 4 |
Plant Configuration | |
Solar Field | |
# of Heliostats (or dishes for dish systems) | 41260 |
Collector/Heliostat Engineering or IP Owner | Brightsource |
USA | |
Collector/Heliostat Model | LH-2.5 |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Tower Height (m) | 250 |
Receiver Manufacturer | Cockerill |
Belgium | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Thermal Energy Storage | |
Storage Capacity (Hours) | 12 |
Storage Description | Molten salt |
TES Engineering Company | Shanghai Lanbin Petrochemical Equipment (LANPEC Technologies Limited) China |