Project Overview | |
Power Station: | Power China Ruoqiang 100MW Tower + 900MW PV |
Location: | Ruoqiang |
Bayingolin | |
Xinjiang (XUAR) China | |
Technology | PV-Hybrid, Tower |
Solar Resource: | 1767 |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2024 |
Background | |
Break Ground Date | 2022 |
Lat/Long Location | 38.15, 90.11 |
Total Power Station Land Area (km2) | 18.8 |
Participants | |
Developer | Power China |
China | |
EPC | China Water Conservancy and Hydropower First Engineering Bureau; Jiangxi Provincial Electric Power Design Institute (JXEPDI); Sepco III of Power China |
China | |
Construction Job Years | 2000 |
Annual Operations Jobs | 200 |
Costs | |
Total Construction Cost (2022) | 1346.00 million |
Total Cost USD (2020) | $200.15 million |
Specific Cost/kW USD (2020) | 2001 |
Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 600000 |
# of Heliostats (or dishes for dish systems) | 12371 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 48 |
Collector/Heliostat Engineering or IP Owner | SEPCO III |
China | |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Thermal Energy Storage | |
Storage Capacity (Hours) | 8 |
Storage Description | Molten Salt |