Project Overview | |
Power Station: | Power China Toksun 100MW Tower + 900MW PV |
Location: | Toksun |
Turpan | |
Xinjiang (XUAR) China | |
Technology | PV-Hybrid, Tower |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2025 |
Background | |
Break Ground Date | 2023 |
Total Power Station Land Area (km2) | 2.5 |
Participants | |
Developer | Power China |
China | |
EPC | Zhongnan Survey and Design Research Institute of Power China |
China | |
Costs | |
Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 440400 |
# of Heliostats (or dishes for dish systems) | 14680 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 30 |
Collector/Heliostat Manufacturer | Cosin Solar |
Collector/Heliostat Engineering or IP Owner | Cosin Solar (Supcon) |
China | |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Receiver Model | Cosin Solar (Supcon) |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Thermal Energy Storage | |
Storage Capacity (Hours) | 12 |
Storage Description | Molten Salt |