Project Overview | |
Power Station: | SUPCON Delingha 50 MW Tower |
Location: | Delingha |
Haixi | |
Qinghai China | |
Owners (%): | SUPCON Solar |
Technology | Power Tower |
Solar Resource: | 2043 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2018 |
Background | |
Break Ground Date | 2016 |
Expected Generation (GWh/year) | 146 |
Lat/Long Location | 37.366,97.293 |
Total Power Station Land Area (km2) | 2.5 |
Participants | |
Developer | SUPCON Solar |
China | |
EPC | SUPCON solar |
China | |
Electricity Generation Offtaker | Qinghai State Grid Electric Power |
Construction Job Years | 1500 |
Annual Operations Jobs | 70 |
Costs | |
Total Construction Cost (2018) | 1050.00 million |
Total Cost USD (2020) | $158.24 million |
Specific Cost/kW USD (2020) | 3164.8 |
LCOE USD/kWh (2020) | 0.09 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration RMB/kWh | 1.15 |
Remuneration Start Year | 2018 |
Remuneration USD/kWh Deflated (2020) | 0.18 |
PPA or Tariff Period (Years) | 20 |
Support Scheme Type | FIT |
Policy Support Scheme | Chinese Demonstration Program 1st Batch |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 542700 |
# of Heliostats (or dishes for dish systems) | 27135 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 20 |
Collector/Heliostat Manufacturer | Supcon |
China | |
Collector/Heliostat Engineering or IP Owner | Supcon |
China | |
Collector/Heliostat Model | SUPCON |
Mirror Manufacturer | Damin Glass |
China | |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Working Fluid Manufacturer | Zhejiang Lianda Chemical Company (supply of Sodium nitrate) |
Tower Height (m) | 200 |
Solar Field or Receiver Inlet Temperture (C) | 290°C |
Solar Field or Receiver Outlet Temperture (C) | 565°C |
Receiver Manufacturer | Hangzhou Boiler Group |
China | |
Receiver Model | External – cylindrical |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Turbine Manufacturer | Hangzhou Steam Turbine Company |
China | |
Turbine Model | N50-13.2/540/540 |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 132 |
Turbine Efficiency Percent | 0.431 |
Steam Generator System Manufacturer | Hangzhou Boiler Group |
China | |
Cooling Type | Dry |
Thermal Energy Storage | |
Storage Type | 2-tank direct |
Storage Capacity (Hours) | 7 |
Storage Description | Molten salt |
TES Engineering Company | Bluestar (Beijing) Chemical Machinery Co., Ltd. China |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP