Project Overview | |
Power Station: | Three Gorges CTGR Henderson Energy Guazhou 2x50MW Tower + 200MW PV + 400MW Wind |
Location: | Qiaowan, Guazhou |
Jiuquan | |
Gansu China | |
Owners (%): | 51% Henderson New Energy Technology Co., Ltd. And China Three Gorges New Energy (Group) Co., Ltd. 49%. |
Technology | Wind-PV-Hybrid, Tower |
Solar Resource: | 1683 |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2024 |
Background | |
Break Ground Date | 2022 |
Lat/Long Location | 40.59, 96.46 |
Participants | |
Developer | Three Gorges and Hernderson Energy |
China | |
EPC | China Energy Construction Gezhouba Electric Power of CEEC |
China | |
Electricity Generation Offtaker | Gansu State Grid Electric Power |
Costs | |
Remuneration RMB/kWh | 0.31 |
Remuneration Start Year | 2021 |
Remuneration USD/kWh Deflated (2020) | 0.05 |
Support Scheme Type | FIT |
Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration | |
Solar Field | |
# of Heliostats (or dishes for dish systems) | 26964 |
Collector/Heliostat Engineering or IP Owner | Hengji Nengmai |
China | |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Tower Height (m) | 200 |
Receiver Manufacturer | Harbin Electric Boiler |
China | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Turbine Manufacturer | Harbin Electric |
China | |
Power Cycle | Steam Rankine |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP