Project Overview | |
Power Station: | CTGR Qinghai Qingyu DC 100MW Tower + 900MW PV |
Location: | Golmud, Wutumeiren, Haixi, Qinghai China |
Technology | PV-Hybrid, Tower |
Solar Resource: | 1723 |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2024 |
Status Date | April 17, 2024 |
Background | |
Break Ground Date | 2023 |
Lat/Long Location | 36.79, 93.36 |
Expected Generation (GWh/year) | 227.1 |
Total Power Station Land Area (km2) | 2.86 |
Participants | |
Developer | China Three Gorges Renewables (CTGR), China |
EPC | Northwest Engineering Corporation(Power China); Cosin Solar; Zhejiang Thermal Power Construction of CEEC, China |
Costs | |
Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration | |
Solar Field | |
Collector/Heliostat Engineering or IP Owner | Cosin Solar (Supcon), China |
Solar Field Aperture Area (m2) | 711930 |
Quantity of Heliostats (or dishes for dish systems) | 23731 |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten Salt |
Receiver Working Fluid Category | Salt |
Receiver Model | Cosin Solar (Supcon) |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 100 MW |
Thermal Energy Storage | |
Storage Capacity (Hours) | 12 |
Storage Description | Molten Salt |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...