Project Overview | |
Power Station: | Shouhang Dunhuang Phase I – 10 MW Tower |
Location: | Dunhuang, Jiuquan, Gansu, China |
Owners (%): | Shouhang |
Technology | Tower |
Solar Resource: | 1777 |
Nominal Capacity: | 10 MW |
Status | Operational |
Start Year: | 2016 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2014 |
Lat/Long Location | 40.083,94.434 |
Total Power Station Land Area (km2) | 1.2 |
Participants | |
Developer | Shouhang, China |
EPC | Suncan (Shouhang), China |
Electricity Generation Offtaker | Gansu State Grid Electric Power |
Costs | |
Total Construction Cost (2016) | 420.00 million |
Total Cost USD (2020) | $65.58 million |
Specific Cost/kW USD (2020) | 6557.8 |
Remuneration RMB/kWh | 0.3 |
Remuneration Start Year | 2016 |
Remuneration USD/kWh Deflated (2020) | 0.18 |
PPA or Tariff Period (Years) | 20 |
Concessional Funding or Other Support | Asian Development Bank $100 million |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 175375 |
# of Heliostats (or dishes for dish systems) | 1525 |
Heliostat Aperture Area (m2) (or dish aperature for dish systems) | 116 |
Collector/Heliostat Manufacturer | Shouhang, China |
Collector/Heliostat Engineering or IP Owner | Shouhang |
Solar Field (Receiver) | |
Receiver Working Fluid | Molten salt |
Receiver Working Fluid Category | Salt |
Tower Height (m) | 138 |
Receiver Manufacturer | Shouhang, China |
Receiver Model | External – cylindrical |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 10 MW |
Power Cycle | Steam Rankine |
Thermal Energy Storage | |
Storage Type | 2-tank direct |
Storage Capacity (Hours) | 15 |
Storage Description | Molten salt |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...