Project Overview | |
Power Station: | Jemalong Solar Thermal Station |
Location: | Jemalong, New South Wales, Australia |
Owners (%): | Vast Solar |
Technology | Power Tower |
Nominal Capacity: | 1.1 MW |
Status | Operational |
Start Year: | 2017 |
Status Date | October 21, 2022 |
Background | |
Break Ground Date | 2014 |
Expected Generation (GWh/year) | 2.2 |
Lat/Long Location | -33.4,148.1 |
Total Power Station Land Area (km2) | 0.1 |
Participants | |
Developer | Vast Solar, Australia |
Operator | Vast Solar, Australia |
Electricity Generation Offtaker | Essential Energy |
Costs | |
Total Construction Cost (2017) | 21.00 million |
Total Cost USD (2020) | $16.41 million |
Specific Cost/kW USD (2020) | 14919.4 |
LCOE USD/kWh (2020) | 0.64 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Concessional Funding or Other Support | AU$8.89 million from ARENA |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 15000 |
# of Heliostats (or dishes for dish systems) | 3500 |
Collector/Heliostat Engineering or IP Owner | Vast Solar, Australia |
Solar Field (Receiver) | |
Receiver Working Fluid | Liquid sodium |
Tower Height (m) | 30 |
Receiver Manufacturer | Vast Solar |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1.1 MW |
Power Cycle | Steam Rankine |
Cooling Type | Dry |
Thermal Energy Storage | |
Storage Type | 2-tank direct |
Storage Capacity (Hours) | 3 |
Storage Description | Liquid sodium |