Project Overview | |
Power Station: | Aalborg CSP-Brønderslev CSP with ORC project |
Location: | Brønderslev, North Jutland, Denmark |
Owners (%): | Brønderslev Forsynin |
Technology | Biomass-Hybrid, Trough |
Solar Resource: | 1025 |
Nominal Capacity: | 5.5 MW |
Status | Operational |
Start Year: | 2016 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2016 |
Lat/Long Location | 57.254,9.989 |
Participants | |
Developer | Aalborg CSP, Denmark |
EPC | Aalborg CSP, Denmark |
Denmark | |
Costs | |
Remuneration Start Year | 2016 |
Concessional Funding or Other Support | Danish Government’s Energy Technology Development and Demonstration Programme (EUDP) |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 26929 |
# of Solar Collector Assemblies (SCAs) | 40 |
# of Loops | 10 |
# of SCAs per Loop | 4 |
# of Modules per SCA | 10 |
SCA Aperture Area (m²) | 674 |
SCA Length (m) | 125 |
Collector/Heliostat Manufacturer | Aaltrough, Denmark |
Collector/Heliostat Engineering or IP Owner | Aalborg CSP, Denmark |
Collector/Heliostat Model | Aaltrough |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide: Therminol VP-1 |
Receiver Working Fluid Category | Thermal oil/organics |
Working Fluid Manufacturer | Eastman/Solutia |
# of Heat Collector Elements (HCEs) | 1200 |
Solar Field or Receiver Inlet Temperture (C) | 252°C |
Solar Field or Receiver Outlet Temperture (C) | 312°C |
Receiver Manufacturer | Aalborg CSP, Denmark |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 5.5 MW |
Power Cycle | Organic Rankine |