Project Overview | |
Power Station: | Ashalim Plot A /Negev Energy |
Location: | Ashalim, Southern District, Israel |
Owners (%): | Negev Energy, Noy Fund |
Technology | Parabolic Trough |
Solar Resource: | 2393 |
Nominal Capacity: | 110 MW |
Status | Operational |
Start Year: | 2019 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2015 |
Expected Generation (GWh/year) | 415 |
Lat/Long Location | 30.967,34.684 |
Participants | |
Developer | Abengoa, Shikun&Binui |
EPC | TSK, Abengoa, Solel |
Electricity Generation Offtaker | Israel Electricity Corporation |
Construction Job Years | 633 |
Annual Operations Jobs | 60 |
Costs | |
Total Construction Cost (2017) | $ 1000.00 million |
Total Cost USD (2020) | $1017.45 million |
Specific Cost/kW USD (2020) | 9249.6 |
LCOE USD/kWh (2020) | 0.21 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration ILS/kWh | 0.76 |
Remuneration Start Year | 2017 |
Remuneration USD/kWh Deflated (2020) | 0.23 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | PPA |
Concessional Funding or Other Support | Private Investment Corporation (OPIC), the European Investment Bank (EIB) 150 Mio Euro, Israel’s Bank Leumi and Bank Hapoali |
Plant Configuration | |
Solar Field | |
# of Modules per SCA | 10 |
Collector/Heliostat Manufacturer | Abengoa |
Collector/Heliostat Engineering or IP Owner | Abengoa |
Collector/Heliostat Model | E2 |
Mirror Manufacturer | Rioglass |
Solar Field (Receiver) | |
Receiver Working Fluid | Thermal oil |
Receiver Working Fluid Category | Thermal oil/organics |
Receiver Manufacturer | Rioglass |
Power Block | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 110 MW |
Power Cycle | Steam Rankine |
Thermal Energy Storage | |
Storage Type | 2-tank indirect |
Storage Capacity (Hours) | 4.5 |
Storage Description | Molten salts |