Project Overview | |
Power Station: | Rende-CSP Plant |
Location: | Rende, Calabria Italy |
Owners (%): | Falck Renewables |
Technology | Linear Fresnel |
Nominal Capacity: | 1 MW |
Status | Operational |
Start Year: | 2014 |
Status Date | December 05, 2021 |
Background | |
Break Ground Date | 2013 |
Expected Generation (GWh/year) | 3 |
Lat/Long Location | 39.374,16.246 |
Total Power Station Land Area (km2) | 0.02 |
Participants | |
Developer | Falck Renewables, Italy |
EPC | Elianto |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 9780 |
Solar Field (Receiver) | |
Receiver Working Fluid | Diathermic oil |
Solar Field or Receiver Outlet Temperture (C) | 280°C |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 1 MW |
Power Cycle | Organic Rankine |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...