Project Overview | |
Power Station: | Casablanca |
Location: | Talarrubias, Badajoz, Extremadura Spain |
Owners (%): | ACS/Cobra |
Technology | Parabolic Trough |
Solar Resource: | 2064 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2013 |
Status Date | October 21, 2022 |
Background | |
Expected Generation (GWh/year) | 160 |
Lat/Long Location | 39.239,-5.314 |
Total Power Station Land Area (km²) | 2 |
Participants | |
Developer | Cobra, Spain |
EPC | Cobra, Spain |
Electricity Generation Offtaker | Endesa |
Costs | |
Total Construction Cost (2013) | € 345.00 million |
Total Cost USD (2020) | $495.23 million |
Specific Cost/kW USD (2020) | 9904.6 |
LCOE USD/kWh (2020) | 0.27 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration EUR/kWh | 0.27 |
Remuneration Start Year | 2013 |
Remuneration USD/kWh Deflated (2020) | 0.39 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | FIT |
Policy Support Scheme | Real Decreto 661/2007 |
Concessional Funding or Other Support | EIB €140 million |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 510120 |
# of Solar Collector Assemblies (SCAs) | 624 |
# of Loops | 156 |
# of SCAs per Loop | 4 |
# of Modules per SCA | 12 |
SCA Aperture Area (m²) | 817 |
SCA Length (m) | 144 |
Collector/Heliostat Manufacturer | Sener, Spain |
Collector/Heliostat Engineering or IP Owner | Sener, Spain |
Collector/Heliostat Model | SenerTrough |
Mirror Manufacturer | Flabeg, Germany |
Mirror Model | RP3 |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide |
Receiver Working Fluid Category | Thermal oil/organics |
# of Heat Collector Elements (HCEs) | 22464 |
Solar Field or Receiver Inlet Temperture (C) | 293°C |
Solar Field or Receiver Outlet Temperture (C) | 393°C |
Receiver Manufacturer | Solel, Israel |
Receiver Model | UVAC-2008 |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Turbine Manufacturer | Siemens, Germany |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 100 |
Turbine Efficiency Percent | 38.1 |
Cooling Type | Wet |
Thermal Energy Storage | |
Storage Type | 2-tank indirect |
Storage Capacity (Hours) | 7.5 |
Storage Description | 60% Sodium Nitrate, 40% Potassium Nitrate. |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...