Project Overview | |
Power Station: | Termesol 50 |
Location: | San José del Valle |
Cádiz | |
Andalusia Spain | |
Owners (%): | Torresol (Sener, Masdar) |
Technology | Parabolic Trough |
Solar Resource: | 2007 |
Nominal Capacity: | 50 MW |
Status | Operational |
Start Year: | 2011 |
Status Date | October 21, 2022 |
Background | |
Break Ground Date | 2009 |
Expected Generation (GWh/year) | 175 |
Lat/Long Location | 36.661,-5.847 |
Total Power Station Land Area (km²) | 2.3 |
Participants | |
Developer | Torresol |
Spain, UAE | |
EPC | Sener |
Spain | |
Operator | Torresol |
Construction Job Years | 900 |
Annual Operations Jobs | 45 |
Costs | |
Total Construction Cost (2011) | € 270.00 million |
Total Cost USD (2020) | $420.48 million |
Specific Cost/kW USD (2020) | 8409.6 |
LCOE USD/kWh (2020) | 0.21 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration EUR/kWh | 0.27 |
Remuneration Start Year | 2011 |
Remuneration USD/kWh Deflated (2020) | 0.42 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | FIT |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m²) | 510120 |
# of Solar Collector Assemblies (SCAs) | 624 |
# of Loops | 156 |
# of SCAs per Loop | 4 |
SCA Aperture Area (m²) | 817 |
Collector/Heliostat Manufacturer | Sener |
Spain | |
Collector/Heliostat Engineering or IP Owner | Sener |
Spain | |
Collector/Heliostat Model | SenerTrough2 |
Mirror Manufacturer | Flabeg |
Germany | |
Mirror Model | RP3 |
Solar Field (Receiver) | |
Receiver Working Fluid | Biphenyl/Diphenyl oxide |
Receiver Working Fluid Category | Thermal oil/organics |
Solar Field or Receiver Inlet Temperture (C) | 293°C |
Solar Field or Receiver Outlet Temperture (C) | 393°C |
Receiver Manufacturer | Schott |
Germany | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 50 MW |
Power Cycle | Steam Rankine |
Power Cycle Pressure (Bar) | 100 |
Turbine Efficiency Percent | 38.1 |
Cooling Type | Wet |
Thermal Energy Storage | |
Storage Type | 2-tank indirect |
Storage Capacity (Hours) | 7.5 |
Storage Description | 28,500 tons of molten salt. 60% sodium nitrate, 40% potassium nitrate. |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP