Project Overview | |
Power Station: | Dadri ISCC Plant |
Location: | Dadri |
Uttar Pradesh India | |
Owners (%): | NTCP |
Technology | ISCC, Fresnel |
Solar Resource: | 1223 |
Nominal Capacity: | 14 MW |
Status | Operational |
Start Year: | 2019 |
Status Date | October 25, 2023 |
Background | |
Break Ground Date | 2016 |
Expected Generation (GWh/year) | 14 |
Lat/Long Location | 28.578,77.632 |
Participants | |
Developer | Frenell |
Germany | |
EPC | Thermax |
India | |
Electricity Generation Offtaker | NTCP |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m虏) | 33000 |
# of Lines | 0 |
Collector/Heliostat Engineering or IP Owner | Frenell |
Spain, Germany | |
Solar Field (Receiver) | |
Receiver Working Fluid | Water/Steam |
Receiver Working Fluid Category | Water |
Solar Field or Receiver Outlet Temperture (C) | 250°C |
Receiver Manufacturer | Royal Tech |
China | |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 14 MW |
Power Cycle | Steam Rankine |