Project Overview | |
Power Station: | Dhursar |
Location: | Dhursar |
Rajasthan India | |
Owners (%): | Reliance power |
Technology | Linear Fresnel |
Solar Resource: | 1742 |
Nominal Capacity: | 125 MW |
Status | Operational |
Start Year: | 2014 |
Status Date | October 21, 2022 |
Background | |
Expected Generation (GWh/year) | 280 |
Lat/Long Location | 26.786,72.008 |
Total Power Station Land Area (km虏) | 3.4 |
Participants | |
Developer | Rajasthjan Sun Technique Energy, Areva |
India, France | |
EPC | Areva |
France | |
Electricity Generation Offtaker | NTPC Vidyut Vyapar Nigam |
Costs | |
Total Construction Cost (2014) | 21000.00 million |
Total Cost USD (2020) | $366.24 million |
Specific Cost/kW USD (2020) | 2929.9 |
LCOE USD/kWh (2020) | 0.11 |
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank’s GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |
Remuneration INR/kWh | 11.97 |
Remuneration Start Year | 2014 |
Remuneration USD/kWh Deflated (2020) | 0.21 |
PPA or Tariff Period (Years) | 25 |
Support Scheme Type | PPA |
Concessional Funding or Other Support | Asian Development Bank $103 million; also from FMO (Dutch development bank) |
Plant Configuration | |
Solar Field | |
# of Lines | 0 |
Collector/Heliostat Engineering or IP Owner | Areva Solar |
USA | |
Solar Field (Receiver) | |
Receiver Working Fluid | Water/Steam http://oa.upm.es/23011/1/INVE_MEM_2013_151623.pdf |
Receiver Working Fluid Category | Water |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 125 MW |
Power Cycle | Steam Rankine |
Cooling Type | Wet |
China: Yumen Xinneng/Xinchen 50MW Beam-down CSP
Project Overview Power Station:Yumen Xinneng / Xinchen - 50MW Beam-downLocation:YumenJiuquanGansu ChinaOwners (%):Yumen Xinneng Thermal Power Co., Ltd owned by Thvom...