Project Overview | |
Power Station: | Airlight Energy Ait-Baha Pilot Plant |
Location: | Ait Baha |
Souss-Massa Morocco | |
Owners (%): | Cimar, Italcementi Group |
Technology | Parabolic Trough |
Solar Resource: | 2200 |
Nominal Capacity: | 3 MW |
Status | Operational |
Start Year: | 2014 |
Status Date | December 02, 2021 |
Background | |
Break Ground Date | 2012 |
Expected Generation (GWh/year) | 2.39 |
Lat/Long Location | 30.218,-9.149 |
Total Power Station Land Area (km2) | 0.24 |
Participants | |
Developer | Airlight Energy |
Switzerland | |
Operator | Cimar, Italcementi Group |
Electricity Generation Offtaker | Cimar, Italcementi Group |
Plant Configuration | |
Solar Field | |
Solar Field Aperture Area (m2) | 6159 |
# of Solar Collector Assemblies (SCAs) | 3 |
# of Loops | 1 |
# of SCAs per Loop | 3 |
# of Modules per SCA | 12 |
SCA Aperture Area (m虏) | 2053 |
SCA Length (m) | 215 |
Mirror Manufacturer | Airlight Energy |
Switzerland | |
Solar Field (Receiver) | |
Receiver Working Fluid | Air |
Receiver Working Fluid Category | Air |
# of Heat Collector Elements (HCEs) | 108 |
Solar Field or Receiver Inlet Temperture (C) | 270°C |
Solar Field or Receiver Outlet Temperture (C) | 570°C |
Receiver Manufacturer | Ailight Energy |
Power Block | |
Nominal Turbine or Power Cycle Capacity | 3 MW |
Turbine Manufacturer | Turboden |
Italy | |
Power Cycle | Organic Rankine |
Thermal Energy Storage | |
Storage Type | Other |
Storage Capacity (Hours) | 5 |
Storage Description | Packed-bed of rocks |