2011-2015

USA: Crescent Dunes Solar Energy Project CSP Tower 110MW

Project Overview Power Station:Crescent Dunes Solar Energy ProjectLocation:TonopahNevada United StatesOwners (%):SolarReserveTechnologyPower TowerSolar Resource:2734Nominal Capacity:110 MWStatusOperationalStart Year:2015  Background Break Ground Date2011Expected Generation (GWh/year)500Lat/Long Location38.239,-117.363Total...

USA: Genesis Solar Energy Project CSP Trough 250MW

Project Overview Power Station:Genesis Solar Energy ProjectLocation:BlytheCalifornia United StatesOwners (%):Genesis SolarTechnologyParabolic TroughSolar Resource:2676Nominal Capacity:250 MWStatusOperationalStart Year:2014  Background Break Ground Date2010Expected Generation (GWh/year)580Lat/Long Location33.667,-114.983Total...

USA: Mojave Solar Project CSP Trough 280MW

Project Overview Power Station:Mojave Solar ProjectLocation:Harper Dry LakeCalifornia United StatesOwners (%):Mojave SolarTechnologyParabolic TroughSolar Resource:2888Nominal Capacity:280 MWStatusOperationalStart Year:2014Status DateOctober 25, 2023  Background Break Ground...

USA: Solana Generating Station CSP Trough 250MW

Project Overview Power Station:Solana Generating StationLocation:PhoenixGila BendArizona United StatesOwners (%):AbengoaTechnologyParabolic TroughSolar Resource:2784Nominal Capacity:250 MWStatusOperationalStart Year:2013Status DateOctober 21, 2022  Background Break Ground Date2010Expected Generation...

USA: Tooele Army Depot CSP Dish 1.5MW

Project Overview Power Station:Tooele Army DepotLocation:TooeleTooele CountyUtah United StatesOwners (%):Tooele Army DepotTechnologyDishNominal Capacity:1.5 MWStatusCurrently Non-OperationalStatus DateDecember 05, 2021  Background Break Ground Date2012Lat/Long Location40.501,-112.374Total...

Morocco: NOOR I CSP Trough 160MW

Project Overview Power Station:NOOR ILocation:Ouarzazate Drâa-Tafilalet MoroccoOwners (%):ACWATechnologyParabolic TroughSolar Resource:2497Nominal Capacity:160 MWStatusOperationalStart Year:2015Status DateOctober 25, 2023  Background Break Ground Date2013Expected Generation (GWh/year)370Lat/Long Location30.994,-6.863  Participants DeveloperACWASaudi ArabiaEPCAcciona,...