Latest Post

Spain: Extresol 2 CSP Trough 50MW

Project Overview Power Station:Extresol 2Location:Torre de Miguel SesmeroBadajozExtremadura SpainOwners (%):FCC EnergyTechnologyParabolic TroughSolar Resource:2096Nominal Capacity:50 MWStatusOperationalStart Year:2010Status DateOctober 21, 2022  Background Break Ground...

Spain: Extresol 1 CSP Trough 50MW

Project Overview Power Station:Extresol 1Location:Torre de Miguel Sesmero Badajoz Extremadura SpainOwners (%):FCC EnergyTechnologyParabolic TroughSolar Resource:2096Nominal Capacity:50 MWStatusOperationalStart Year:2010Status DateOctober 21, 2022  Background Break Ground...

Spain: Enerstar CSP Trough 50MW

Project Overview Power Station:EnerstarLocation:Villena, Alicante, Comunidad Valenciana, SpainOwners (%):FCC EnergyTechnologyParabolic TroughSolar Resource:1992Nominal Capacity:50 MWStatusOperationalStart Year:2013Status DateOctober 21, 2022  Background Break Ground Date2010Expected...

Spain: CRS Sales CSP Tower 5 MW

Power Station:CRS SalesLocation:Sevilla, Andalusia SpainTechnologyPower TowerNominal Capacity:5 MWStatusOperationalStart Year:2012  Status Date October 21, 2022  Background Participants DeveloperAbengoa, Spain  Plant Configuration Solar Field Solar Field Aperture Area (m2)10560#...

Spain: Casablanca CSP Trough 50MW

Project Overview Power Station:CasablancaLocation:Talarrubias, Badajoz, Extremadura SpainOwners (%):ACS/CobraTechnologyParabolic TroughSolar Resource:2064Nominal Capacity:50 MWStatusOperationalStart Year:2013Status DateOctober 21, 2022  Background Expected Generation (GWh/year)160Lat/Long Location39.239,-5.314Total Power...

Spain: Borges Termosolar CSP Trough 22.5MW

Project Overview Power Station:Borges TermosolarLocation:Les Borges Blanques, Lleida, Catalonia, SpainOwners (%):Abantia, ComsaTechnologyBiomass-Hybrid, TroughSolar Resource:1878Nominal Capacity:22.5 MWStatusOperationalStart Year:2012Status DateOctober 25, 2023  Background Break...

Page 17 of 26 1 16 17 18 26